Charging infrastructure built for how your location actually works.

Most EV charging is either too slow or massively overbuilt for where vehicles actually park. Nodal installs low-power DC charging matched to your dwell time, sized for your existing grid, operational in weeks.

The argument

Nobody is optimising for dwell time.

The EV charging market built for two things: your home and the motorway. Everything in between was ignored.

The problem with AC

Capped at 11 kW by the vehicle's onboard charger. Regardless of what the post is rated at.

The problem with high-power DC

Grid connections cost €50k–€500k extra. Built for motorways. Not your car park.

The Nodal answer

The right power for the right place. Existing grid connection. Live in weeks.

Who it's for

Four locations. One platform.

Fleet & Depots

Fleet & Depots

Reliable overnight charging designed around fleet schedules, not grid upgrades.

Workplaces & Business Parks

Workplaces & Business Parks

Give employees and visitors meaningful charging during the working day.

Retail & Hospitality

Retail & Hospitality

Add significant range while customers shop, dine, stay or visit.

Urban Charging Networks

Urban Charging Networks

Expand charging coverage with lower infrastructure costs and faster deployment.

The comparison

Three ways to charge. One is matched to how vehicles actually park.

Reference
AC Charging
Onboard-charger limited
kW delivered (actual)
≤ 11 kW
Install cost
€2–8k
Install / permitting
Days
Grid connection
Low voltage
Charge time, 60 kWh
5–6 hrs
Best-fit use case
Home / overnight
Nodal
Low-Power DC
Right-sized for dwell
kW delivered (actual)
30–40 kW
Install cost
€10–20k
Install / permitting
2–8 weeks
Grid connection
Low voltage
Charge time, 60 kWh
1.5–2 hrs
Best-fit use case
Commercial dwell
Reference
High-Power DC
Motorway-grade
kW delivered (actual)
35–67 kW avg*
Install cost
€150–500k+
Install / permitting
12–36 months
Grid connection
High voltage
Charge time, 60 kWh
15–25 min
Best-fit use case
Motorway transit

*Fastned Q1 2026 — average Dutch DC session.

SOME OF OUR PARTNERS
Maxem
Monta
Road
Ampeco
Chargecloud
Tap

Full software integration built in from day one. No compatibility surprises.

Partner with Nodal

Join as an installer, integrate as a CPMS or software partner, or tell us about a site.

Our chargers

Session. Built for dwell time.

Our Session chargers deliver 30–40 kW directly to the battery — fast enough to fill a 60 kWh pack in a typical commercial dwell window, slow enough to run on existing low-voltage grid connections.